AI FOR DATA CENTER ENGINEERING AND OPERATIONS

Your site. Understood.

From bringing it live to everything that comes next.

NORTH CAMPUS / DC-01Acceptance review
INSIDE THE FACILITY

Commissioning crews are testing the facility.

Preparing the facility…
Drag to orbit · Click equipment
MODEL 01 / CONTINUOUS
Bring it live
01Bring it live

Open with the confidence to operate.

Turn a finished building into a facility your team is ready to run.

  • Close the document gaps

    AI organizes as-builts, manuals and test records, and identifies what is missing.

  • Clear the readiness gates

    Prepare procedures and tasks, check the evidence, and resolve the decisions before go-live.

  • Build the maintenance plan

    Create preventive schedules from your equipment records and manufacturer requirements.

In the facilityInteractive
Readiness gates4 checks remaining
28 / 32

Cooling acceptance is awaiting its witness record.

CommissioningReadinessPreventive maintenance
Scroll to explore the life of the facility
Illustrative facility and workflows
SOURCES OF VALUE

Better operations.
Measurable value.

Keep the facility available. Give your experts time back. Turn operational discipline into evidence that customers and insurers can trust.

01 / MORE RELIABLE OPERATIONS

Protect the minutes
that matter.

The value starts before an incident: better procedures, clearer field checks, and maintenance that stays on schedule.

  • Catch issues before work starts.

    Generate and review procedures against your facility’s drawings, equipment, operating rules, and design.

    Procedure generation & review
  • Bring the checks into the field.

    Explore guided iPad execution, equipment verification, and evidence captured as each step is completed.

    Fieldwork & iPad · explore scope
  • Keep maintenance ahead of failures.

    Plan preventive schedules around asset requirements, service intervals, and the work your site needs.

    Maintenance planning · planned
ILLUSTRATIVE COST EXPOSURE
$150,000

exposure over 30 minutes of disruption

30 min
0 minutes120 minutes

30 minutes × $5,000 per minute = $150,000

Use a cost estimate for your operation. This models exposure for one event; it does not predict an outage or a reduction in risk.

Sources & calculation notes
[1] The cost of outages

Uptime Institute’s Annual outage analysis 2026 reports the 57% finding from its 2025 annual survey. Costs are self-reported for respondents’ most recent major outage.

Read the 2026 report
[2] The staffing challenge

Global Data Center Survey 2025, Figure 15: 46% reported difficulty finding qualified candidates. This question had 650 respondents.

Read the 2025 survey
[3] Insurance economics

$1,000,000 × 1% = $10,000 per year. This is arithmetic, not a quoted discount. FM describes engineering-led risk assessment for data centers; it does not verify an Entangl premium benefit.

Read the insurer’s perspective

Industry research describes the problem. The calculators use illustrative, editable assumptions and are not measured Entangl outcomes. Outage exposure, team capacity, and premium sensitivity are separate measures and are not added into a single ROI figure.

Find the pressure behind the value

SIX PRESSURES. EXPLORE THE NUMBERS.

Start with the pressure
you’re under.

Protect uptime. Give your teams time back. Make growth visible. Choose a problem or explore all six.

Industry statistics include their sources. All facility records and adjustable calculations below are illustrative.

PROTECT UPTIME

Trace equipment dependencies.

Before a change, your team needs to know what depends on the equipment. Select an asset and follow its documented connection.

Select equipment, then trace the connection.

SIMPLIFIED CONNECTION MAPIllustrative
Simplified example: UPS-A connects to Hall 01 through PDU-A. UPS-B connects to Hall 02 through PDU-B. CRAH-02 serves Hall 02. Current operating states are not verified. UPS-APDU-AHall 01 UPS-BPDU-BHall 02 CRAH-02Cooling connection
?What depends on UPS-B?Trace the documented connection to find out.

Connectivity is one part of a review. Confirm current states, redundancy, and approvals before real work.

Back to all six
SCALE YOUR TEAM’S WORK

Calculate workload as your portfolio grows.

Every new site adds procedure work. Change the inputs to see how much preparation and review time your portfolio requires.

Adjust the sites, procedures, and hours.

MONTHLY PROCEDURE WORK · YOUR INPUTS
384engineering
hours / month

8 sites × 12 procedures × 4 hours

Site 01
12 procedures
Site 02
12 procedures
Site 03
12 procedures
Site 04
12 procedures
Site 05
12 procedures
Site 06
12 procedures
Site 07
12 procedures
Site 08
12 procedures
96 procedures / month48 eight-hour workdays

Adjustable workload estimate. Preparation and review time per procedure is your assumption; no savings are predicted.

sites
1 sites24 sites
procedures
1 procedures40 procedures
hours
0.5 hours8 hours
Back to all six
MAKE SENSE OF SIGNALS

Bring separate signals into one issue.

A reading alone does not organize a response. Connect three sample signals to the asset, evidence, and work that need attention.

Bring the readings together, then separate them.

HALL 02 · FICTIONAL SIGNALSAwaiting context
H02-INLET-0229.4°C

Inlet temperature

Above sample threshold
CRAH02-RETURN33.1°C

Return temperature

Related reading
CRAH02-FAN82%

Fan speed

Related reading
READINGS RECEIVED · NO RESPONSE ORGANIZED

Who is picking this up?

The numbers arrived. The asset records, review, and field task still need to come together.

?
Same sample signals. Watch the context change.

Scripted example of readings attached to an issue. It does not diagnose a fault or control equipment.

Back to all six
FIND TIME LOST WAITING

Adjust delays and see where time goes.

The work takes 90 minutes in this example. See how waiting for a reviewer or a field handoff changes the whole day.

Move either delay slider to reshape the timeline.

ONE JOB · ADJUSTABLE EXAMPLE8h 30m elapsed
7hwaiting between
people
90 minutes of work82% of elapsed time waiting
Preparation45 min
Review queue3h
Review15 min
Field handoff4h
Record30 min

Sequential example; work time is fixed at 90 minutes. Adjust the two wait periods to see their share of elapsed time.

Where does your work wait?

min
0 min480 min
min
0 min480 min

Use the picture to find a handoff worth improving. These timings are assumptions, not measured Entangl results.

Back to all six
MAKE THE RECORD CLEAR

Scrub through approvals and evidence.

Follow one event from the first signal to a published update. Switch audience to see which information is available at each moment.

Move through time. Switch between auditor and customer.

ONE EVENT · TWO RESPONSIBILITIES

What can this person see at this moment?

ISS-014 · AUDIT HISTORY3 of 6 records available
09:45

Field task approved

A non-invasive inspection was approved and assigned to the fictional field engineer.

Recorded byDemo operatorEvidence referenceApproval A-014

Illustrative chronology and audience views. These sample records describe a fictional event; they are not live facility records.

Back to all six
SPOT THE CAPACITY CONVERSATION

Move demand toward a customer’s contract limit.

Your customer’s usage can become a commercial conversation. Move the measured demand to see how much contractual headroom remains.

Drag demand toward, or beyond, the 500 kW limit.

CUSTOMER B · ILLUSTRATIVE DEMAND500 kW contract
Illustrative demand shape, with a selected peak of 465 kilowatts and a contractual limit of 500 kilowatts. Not a forecast.020040030-day examplePeakCONTRACTED LIMIT · 500 kW
kW
250 kW550 kW
Back to all six

Choose a moment.
See the evidence.

One facility. Different decisions.
Follow the connection that matters to you.

ILLUSTRATIVE EXAMPLE

What needs attention before work starts?

The procedure references an older drawing revision. Open the source and see the decision your reviewer needs to make.

Open the review example
THE PROBLEM ISN’T A LACK OF INFORMATION

The work is connected.
The information should be too.

The drawing is in one place. The manual is in another. The latest change is with someone on shift. Entangl connects that site information to the procedure your team needs to write or review.

A USEFUL PLACE TO START

Start with the work
on your desk.

Write a procedure. Review one you already use. Put a finding in context with the evidence behind it.

Write a procedureReview an existing procedureUnderstand the site context

Keep your requirements, your site information, and your engineers’ judgment in the work.

MOP-024 / REFERENCE CHECK
IN THE DRAFTBIN THE SITE RECORDC

One finding. Follow the evidence.

See the reference, compare the revisions, and open the reviewer’s decision.

Inspect the exampleFictional site information
BUILD CONFIDENCE WITH THE DETAILS

See the work behind the claim.

Explore the evidenceRead the buyer questionsSet your own test
YOUR SITE IS NEXT

Bring us a task your team knows well.

Bring a procedure, a review bottleneck, or a site question. Agree what to test and what a useful result looks like.

Book a site demo
YOUR ORGANIZATION’S WORKSPACE

Sign in to your site.

Open the Entangl workspace address from your organization’s invitation. Your site team can help you find the correct workspace.

Need help with access?

Contact Entangl →