PROCEDURE CREATION

Your procedure.
Your site, in every detail.

Start with the work you need to do. Entangl helps turn your site information, operating rules, and required format into a procedure your engineers can review.

01MOP · SOP · EOP02Site-specific context03Your template and approvals
EXPLORE AN INTERACTIVE EXAMPLE

Change the brief.
Watch the draft change.

Choose a procedure type and a site. Remove a source to see which information the reviewer would still need.

ENTANGL / WRITE PROCEDURES
MOP / EXAMPLE DRAFTEngineer review required

Planned UPS inspection

North CampusUPS-BOperations template
01

Scope & equipment

The task is scoped to UPS-B at North Campus / DC-01. Confirm the equipment and the boundary with the site team.

SLD-001 / Rev C
02

Prerequisites & authorizations

Site responsibilities, required reviews, and approved work window are referenced for engineer confirmation.

03

Inspection record

Include the applicable equipment guidance and observation record for UPS-B. This preview contains no live-work instructions.

04

Closeout & recovery references

Record observations, unresolved questions, the responsible reviewer, and the approved follow-up references.

Context included. Review still required.

The site, source set, and template change with your brief. Your engineer assesses the resulting draft.

Scripted, interactive preview. All facility records, tasks, measurements, and decisions are illustrative.
WHAT CHANGES FOR YOUR TEAM

A useful first draft
already has the context.

The starting point is your operation: the equipment, the task, the constraints, and the format the team will use.

Specific to the equipment

Bring one-lines, asset information, manuals, and sequences of operation into preparation. Check dependencies and applicable instructions with the site team.

Built around your requirements

Use the sections, terminology, risk methodology, approval fields, and output requirements your organization expects.

Ready for an engineer’s judgement

Make missing information, stop conditions, contingency references, and approval needs explicit before the draft enters the field process.

THE DETAILS THAT MATTER

Keep the detail
that makes it yours.

Use a finished procedure as the reference for what a good output should look like.

Discuss systems and integrations
01

Task and boundary

Define the equipment, work scope, affected systems, and exclusions so a draft does not quietly grow beyond the job.

02

Site rules and constraints

Bring access restrictions, maintenance windows, customer requirements, permits, and the site’s approved risk approach.

03

Template and level of detail

Test tables, headings, signatures, terminology, and export formatting. Confirm the right level of instruction for the people doing the work.

04

Review and revisions

Check the draft, resolve open questions, and retain the approved version in the system your process requires. Reassess site-specific details before reuse.

PROVE IT ON YOUR SITE

A useful conversation
starts with real work.

Choose a representative task, record the baseline, and agree what a useful result must demonstrate.

Open the evaluation planner

Bring to the conversation

  • One task and the equipment involved
  • The relevant drawings, manuals, and site rules
  • Your template and a procedure you consider excellent

Measure in the evaluation

  • Drafting, review, and correction time together
  • Missing details and unsupported assumptions
  • Acceptance of the final document and its format
BUYER QUESTIONS

The questions
behind the decision.

Get the details clear before committing to a rollout.

Security and deploymentPricing and scope
Can it write MOPs, SOPs, and EOPs?

Those are core procedure types. The scope, equipment, applicable documents, and output requirements determine the useful result. Start with a task your team understands well enough to assess the generated draft.

Can we keep our Word template?

Bring the actual template and a completed example. We will test its headings, tables, risk sections, signatures, and export requirements as part of the configuration. Treat formatting fidelity as an evaluation criterion.

What if the drawings or manuals are missing?

Identify the gap and narrow the work to what the available evidence supports. The draft still needs a site expert to resolve missing states, instructions, or requirements. A plausible sentence is not a substitute for that information.

Can we edit the output or reuse a procedure at another site?

The engineer reviews and adapts the draft. A reusable structure can help, but equipment, topology, site rules, customer restrictions, and approvals must be checked again for the destination site.

Will it include contingencies and stop conditions?

Include those in the agreed output requirements and test them against the task. Your reviewer should assess prerequisites, conditions for stopping, escalation, and recovery references with the same care as the main work.

Does generation authorize the work?

No. The result is a draft for review. The site’s authorized people decide whether a procedure is acceptable and whether field work may proceed.

WORKFLOW SCOPE

Procedure creation is a core workflow. Confirm supported inputs, template configuration, and export requirements with a representative document.

MAKE THE NEXT CONVERSATION SPECIFIC

Bring the procedure
you wish took less time.

We’ll use your task and required output to define a useful demonstration, including what your reviewers will need to check.

Book a procedure walkthroughNo site files needed to book.
We’ll agree how to share them if an evaluation follows.

YOUR ORGANIZATION’S WORKSPACE

Sign in to your site.

Open the Entangl workspace address from your organization’s invitation. Your site team can help you find the correct workspace.

Need help with access?

Contact Entangl →